Any road! Roadteam Ltd have sourced both the machinery and expertise to renew almost any existing road by using the materials already present.
Fatted Up Roads
Where frequent cracking, potholes and patching are present
Roads Ready for Upgrade
Bog ramparts, forestry roads
Where it is in-efficient to haul new materials
Where road bearing weights have reached their max.
Process
Ripping
The materials to be recycled are exposed using a tine ripper which is mounted on the front linkage. The depth of ripping is fully adjustable to suit local conditions. Pre-ripping is used to facilitate the crushing process of the existing materials. Typical working depths range from 75mm to 300mm.
Crushing
The rear mounted crusher is then used to crush the exposed materials. At the first stage of crushing the crush size is set to maximum. On the second pass the materials can be reduced to <40mm. Materials (incl. rocks, blocks, concrete, tarmac) up to 400mm in size can be crushed. The crush depth is also controllable electronically. The working width of the crusher is 2.5 metres.
Grading
The crushed material is then graded and profiled to the customer’s requirements using a versatile tractor mounted grader.
Finish
The surface is then compacted with a conventional roller, leaving the surface ready for final treatment by the customer.